Production
Mineral output, ore grade, and recovery metrics — Cerro Verde Complex
Total Gold
1,850 oz
Avg: 154 oz / month
Total Silver
4,710 oz
Avg: 393 oz / month
Total Copper
12,100 ton
Avg: 1,008 ton / month
Avg Gold Grade
3.12 g/t
Target: 3.00 g/t ✓
Avg Recovery Rate
91.2%
Target: 93% — below
Ore Processed
156,400 ton
13,033 ton / month avg
Production by Mineral
Monthly output — Gold (oz), Silver (oz), Copper (ton)
Gold
Monthly production
Silver
Monthly production
Copper
Monthly production
Gold Grade (g/t)
Monthly grade trend · Target: 3
Silver Grade (g/t)
Monthly grade trend · Target: 30
Copper Grade (%)
Monthly grade trend · Target: 0.65
Production Log
Detailed batch records with grade, recovery, and output
20 records
| Date | Zone | Mineral | Raw Ore (ton) | Grade | Recovery % | Output | Shift | Status |
|---|---|---|---|---|---|---|---|---|
| 2026-03-02 | Pit Zone A | Gold | 1,840 | 3.31 g/t | 92.4% | 181.5 oz | A | completed |
| 2026-03-02 | Pit Zone B | Copper | 3,200 | 0.74% | 88.5% | 21 ton | A | completed |
| 2026-03-01 | Processing Plant | Gold | 1,760 | 3.28 g/t | 86.1% | 157.4 oz | B | partial |
| 2026-03-01 | Pit Zone C | Silver | 2,100 | 36.2 g/t | 91% | 2,229 oz | A | completed |
| 2026-02-28 | Pit Zone A | Copper | 3,450 | 0.76% | 89.2% | 23.4 ton | C | completed |
| 2026-02-28 | Level 4 | Gold | 1,250 | 2.85 g/t | 90.8% | 103.9 oz | B | completed |
| 2026-02-27 | Pit Zone B | Silver | 1,980 | 34.8 g/t | 90.2% | 1,999 oz | A | completed |
| 2026-02-27 | Pit Zone A | Gold | 1,920 | 3.45 g/t | 93.1% | 218.7 oz | A | completed |
| 2026-02-26 | Pit Zone C | Copper | 2,900 | 0.68% | 87.4% | 17.3 ton | B | completed |
| 2026-02-26 | Ramp 1 | Silver | 1,650 | 31.8 g/t | 88.6% | 1,468 oz | C | partial |
| 2026-02-25 | Pit Zone A | Gold | 1,700 | 3.12 g/t | 91.5% | 174.2 oz | A | completed |
| 2026-02-25 | Level 4 | Copper | 2,750 | 0.72% | 86.8% | 17.2 ton | B | completed |
| 2026-02-24 | Pit Zone B | Gold | 1,550 | 2.95 g/t | 90% | 131.6 oz | C | completed |
| 2026-02-24 | Pit Zone A | Silver | 2,200 | 38.1 g/t | 92.3% | 2,479 oz | A | completed |
| 2026-02-23 | Pit Zone C | Gold | 1,420 | 2.77 g/t | 88.2% | 111.2 oz | B | partial |
| 2026-02-23 | Ramp 1 | Copper | 2,400 | 0.63% | 85.1% | 12.9 ton | A | completed |
| 2026-02-22 | Processing Plant | Silver | 1,800 | 29.7 g/t | 89.5% | 1,529 oz | C | completed |
| 2026-02-22 | Pit Zone A | Gold | 1,680 | 3.05 g/t | 89.2% | 162 oz | A | failed |
| 2026-02-21 | Pit Zone B | Copper | 3,100 | 0.69% | 87.9% | 18.8 ton | B | completed |
| 2026-02-20 | Level 4 | Silver | 1,920 | 32.1 g/t | 90.4% | 1,792 oz | A | completed |