Live Demo
Interactive demo — Tap the pulsing dots

Dashboard

Cerro Verde Complex — March 2026 · Real-time operations overview

Total Production

14,250 ton

+12.5%vs previous month

Daily Extraction

1,580 ton/day

+8.2%vs previous month

Avg Gold Grade

3.12 g/t

+4.8%vs previous month

Recovery Rate

91.2%

+0.8%vs previous month

Blasting Efficiency

87.3%

+2.1%vs previous month

Equip. Availability

90.0%

-1.5%vs previous month

Cost / Ton

$24.50

-3.2%vs previous month

Hours Worked

9,370 hrs

+5.8%vs previous month
Monthly Production
Gold · Silver · Copper output by month (tons / ounces)
Resources by Process
Percentage distribution across extraction chain
Customizable

Distribution configurable by your actual processes

Connect with your ERP to reflect real-time operational data

Material Movement by Zone
Mineral vs. waste tonnage extracted per pit / area (cumulative)
Operational Costs
Cost distribution by category
Customizable

Cost centers configurable by your structure

Integration with SAP, Oracle, or your accounting system

Resource Consumption
Monthly evolution — diesel, electricity, water, and explosives
Operational Alerts
Active and recent alerts across all mine areas
TypeMessageZonePriorityDateStatus
Personnel detected in blast exclusion zone — detonation haltedPit Zone Acritical2026-03-02resolved
Sandvik DR461i motor failure — awaiting replacement partsWorkshophigh2026-02-25in-progress
Gold recovery rate below 88% threshold (current: 86.1%)Processing Planthigh2026-03-01in-progress
CAT 797F engine oil change due — 2,350 operating hours reachedHaul Road Amedium2026-03-01open
PM10 dust above 150 μg/m³ threshold — water suppression activatedPit Zone Bmedium2026-02-28resolved
Copper grade 0.2% below monthly target in Zone CPit Zone Clow2026-03-02open